Columns and Beams for the Berlin Encore Hotel
Ferra fabricated and supplied structural steel for the Berlin Encore Hotel. The scope supported a multi story building frame and required consistent fit across columns, beams, and connection points.
On projects like this, steel sets the layout for everything that follows. If a frame is off, other trades lose time. Ferra focused on accurate fabrication, reliable delivery, and clear communication with the jobsite team so erection could stay on track.
The result is a steel package that installed cleanly and provided a stable structure for the next phases of construction.